Safety Removal and Installation of Formwork

Safety Removal and Installation of Formwork

Formwork used in the construction industry must be planned, constructed, built, supported, braced, and maintained so that it can withstand all vertical and horizontal loads. If you’re looking to build a formwork company Sydney can boast of, then you should pay adequate attention.

The following are the safety considerations to take when working with formwork.

Safety Removal and Installation of Formwork

Equipment

Any adjustments to the jack arrangement, shoring equipment details, working decks, scaffolds, and all other associated accessories should be included in the drawings or design documents. After all of the details have been developed, the shoring equipment must be examined prior to installation to ensure that it fits the standards indicated in the formwork designs. Use only shoring equipment that is not damaged or shows indicators of being damaged. All formwork shoring equipment must be examined promptly before to, during, and after the installation of concrete. 

Inspect all components thoroughly, and if any are found to be weakened, strengthen them promptly. It is critical to ensure that all base plates, shore heads, extension devices, and screws are hard and securely fastened to the foundation and form. This is why you should always purchase your formwork materials from trusted formwork companies in Sydney.

Concrete

Special considerations must be made when using and designing formwork for cast-in-place concrete. Because of the enormous weight that concrete adds to formwork and shoring equipment, it is critical to ensure that eccentric loads are placed over elements that are built for such loading. Additional shoring criteria must be completed if single-post beaches are employed one on top of another (tiered). The shores must be:

  • Designed by a qualified designer and the erected shoring must be inspected by an engineer qualified in structural design
  • Vertically aligned
  • Spliced to prevent misalignment
  •  Adequately braced in two mutually perpendicular directions at the splicing level

After the concrete has been placed, single-post beaches must not be adjusted to elevate formwork. When the concrete is required to hold loads in excess of its capability, reshoring must be built when the old forms and shores are removed.

Cast-in-Place Concrete

Formwork for cast-in-place operations must be meticulously planned, developed, and inspected. In some cases, you can employ the professional formwork contractors Sydney has. The following are some criteria and regulations for cast-in-place formwork:

  • During the jacking operation, the form structure must remain within all design tolerances for plumbness.
  • The maximum safe rate of lift must not be exceeded.
  • Scaffolds or work platforms must be installed on any vertical slip forms where personnel must work or pass.
  • To prevent overturning and collapse, reinforcing steel for walls, piers, columns, and similar vertical structures must be suitably supported.
  • Employers must take precautions to avoid recoiling of unrolled wire mesh. These precautions may include, but are not limited to, securing each end of the role or handing over the role.

Safety Guidelines

When it’s time to remove formwork, follow these recommendations:

  • Remove forms and beaches (excluding those used for slabs on grade and slip forms) only when the worker has determined that the concrete has grown enough strength to withstand its weight and superimposed loads.
  • Compare concrete strength data to building designs, requirements, and testing findings. The American Society for Testing and Materials (ASTM) standard test technique for determining concrete compressive strength must be used, and the findings must show that the concrete has developed adequate strength to withstand its weight and superimposed loads.
  • Read all your contract technical information covering the procedures on how and when to remove the formwork.

Some Precautions taken during Removal of Formwork are:

  • Always begin removing the formwork when the element has reached the formwork removal time, which is established by laboratory test findings. When testing is not practicable for regular small and conventional constructions, follow the directions in the designs or the structural engineer’s instructions.
  • The IS technique is used to calculate compressive strength. The test is performed in standard cubes and/or cylinders of the same sample mixture.
  • The formwork supports for soffits are not removed until it is determined that they can withstand their own weight as well as the exterior forces.
  • Before beginning the formwork removal procedure, the quality engineers must check the site.
  • Before dismantling the formwork, the workers must have secure access.
  • While removing formwork, special care must be given to freeze-thaw damage and crack development in concrete caused by any type of thermal contraction. If this danger exists, the period for removing the formwork might be postponed. If we had designed and insulated the structure such that they were not vulnerable to such damages, we could remove the formwork at the appropriate time. This is more common in cold weather concreting.
  • A structure’s striking time is determined by its strength or by non-destructive testing.
  • The formwork pieces and associated elements must be placed in such a way that removal is simple. This will aid in the reduction of concrete deterioration.
  • Only by carefully removing the formwork panels will they be able to be reused.
  • An engineer must correctly oversee the formwork removal technique. Concrete of high grade will be devoid of honeycombs and fissures. If there are any flaws, they may be repaired right away.

Formwork Safety Checklist

The following are the formwork safety checklist requirements:

01. The formwork is intended for the structural part in question. Working drawings of the same must be accessible on-site.

02. The strength of the formwork elements must be sufficient to withstand both the structural load and the imposed load.

03. When designing the formwork, all loads, including those generated during the casting process, must be taken into account.

04. During formwork design, the pace of pour, height of concrete pour, sequence, temperatures, and schedule of concrete pouring must all be considered.

05. The safe bearing capability of the earth must be considered while planning the formwork.

06. The on-site working drawing must contain exact dimensions of the compacting aperture and cleanouts.

07. All props must be thoroughly examined. They must be positioned over bearing plates.

08. Defective props must be replaced.

Final thoughts

To avoid poor construction quality, formwork must be struck at the proper moment. The aforementioned formwork removal measures must be observed while casting concrete. Otherwise, the concrete structural elements may crack, collapse, or fail to provide the needed strength. You should also make it a habit to buy from a trustworthy formwork company Sydney can vouch for.

After all, if you need competence for your concrete works, you may also hire professional formwork contractors.